On This Page

Daily Aljian represents pursuing-side claimants in California construction defect litigation – owners and HOAs going after developers and builders, and developers and GCs going after the subs and design professionals down the chain. Contact us at 949-861-2524 for an initial consultation.

What Construction Defect Litigation Covers in California

Construction defect litigation in California means claims brought by owners – and by HOAs and condo associations on their behalf – against the developers, builders, subcontractors, and design professionals responsible for defective work. It also covers the pass-through claims a developer or general contractor then brings against the subs and design pros who actually performed the defective scope.

The legal framework varies with the property type. Residential construction sold after 2003 falls under California’s Right-to-Repair Act, Cal. Civ. Code §§ 895-945.5, which defines actionable defect standards and requires a pre-litigation procedure. Multi-family and condo associations layer on the Calderon process under Cal. Civ. Code § 6000, a mandatory pre-suit framework for common-interest developments. Commercial and mixed-use defect claims are governed by common-law contract and tort principles rather than SB 800. All defect claims operate within California’s statute-of-repose framework – 10 years for latent defects under Cal. Code Civ. Proc. § 337.15 and 4 years for patent defects under § 337.1.

Daily Aljian represents pursuing-side claimants on these matters. The firm does not defend builders, subs, or design professionals on construction defect claims as part of this practice.

California Construction Defects We Litigate

Defect claims organize around two axes – the type of defect and the type of project. Daily Aljian works across both, and most engagements involve multiple defect categories on a single property.

Water Intrusion and Building Envelope Failures

Window and door installation defects, roofing failures, deck-and-balcony waterproofing breaches, missing or incorrectly installed weather-resistive barriers, and flashing details that fail under California’s wet-winter / dry-summer cycle. Water intrusion is the most common defect category in California residential construction and the one most often discovered years after completion, when interior staining, mold, or framing damage finally surfaces.

Structural and Soils-Foundation Defects

Foundation movement, differential settlement on expansive or improperly compacted soils, structural framing deficiencies, and retaining-wall or slope failures. Structural defects are typically the most expensive category to remediate and frequently implicate both the geotechnical and structural design and the construction execution. They are also the category most likely to trigger occupancy or habitability concerns.

Exterior Cladding and Stucco Defects

Stucco cracking and water-management failures, lath and sheathing issues, EIFS systems, fiber-cement and other proprietary siding products. Cladding defects often overlap with water-intrusion claims but warrant a separate investigation track – the failure modes are different and so are the responsible scopes of work.

Mechanical, Electrical, and Plumbing (MEP) Defects

Plumbing supply and drain-line failures, HVAC capacity and performance defects, electrical workmanship issues, and the long-tail systemic problems that surface once the building envelope is addressed. MEP defects are frequently the second-tier issues identified after envelope and structural work is scoped.

Residential Construction Defects – Single-Family, Multi-Family, and HOA

The SB 800 / Right-to-Repair path under Cal. Civ. Code §§ 895-945.5 applies to original construction of new residences sold after 2003. The pre-litigation procedure runs: the owner serves a notice of claim, the builder gets a statutorily defined right to inspect and to make an offer to repair, and litigation follows if the process does not resolve the dispute. For common-interest developments, the Calderon process under Cal. Civ. Code § 6000 layers on additional pre-suit requirements. The 10-year latent-defect statute of repose under Cal. Code Civ. Proc. § 337.15 sets the outer boundary on when a residential defect claim can be brought.

Commercial and Mixed-Use Construction Defects

Commercial defect claims proceed on common-law contract and tort theories – SB 800 does not apply. Office, retail, hospitality, industrial, and mixed-use projects often involve sophisticated owners, complex contracting structures, and binding arbitration provisions. The defect categories track the residential list, but the procedural posture, the contracting documents, and the recoverable damages differ.

Developer and GC Pass-Through Claims Against Subs and Design Professionals

When a defect claim lands on a developer or general contractor, the response is rarely just defense – it is also pushing liability down to the parties who actually performed the work. That means cross-complaints across the contracting chain, express and equitable indemnity claims against subs, contribution claims, and defect-related claims against architects, engineers, and design-build entities for design errors that contributed to the failure. Pursuing the chain is often the central case for a developer or GC defendant.

Related Construction Matters We Handle for Defect-Litigation Clients

Daily Aljian’s construction practice is built around defect litigation, and we handle other contract issues as well. Other construction issues frequently surface inside a defect matter, and the firm handles them as part of the broader engagement.

  • Mechanics’ liens and stop notices when payment for defective work is in dispute or when lien rights need to be perfected or contested during a defect matter.
  • Construction contract disputes – change orders, scope, terminations – where they intersect with a defect claim or arise from the same project.
  • Insurance coverage issues that defect claims trigger – CGL coverage analysis, additional-insured tender, builders-risk claims, and carrier coordination across multiple policies and policy years.
  • Unlicensed-contractor issues under Cal. Bus. & Prof. Code § 7031, including disgorgement remedies, where licensure problems surface during a defect investigation.

Clients looking primarily for general construction contract counsel, standalone mechanics’ lien prosecution, or design-professional defense are better served by firms whose primary practice is in those areas.

How a California Construction Defect Case Proceeds

A defect case proceeds on a different rhythm than typical commercial litigation. The investigation is expert-driven from the start, and the parties involved expand as the case develops.

Step 1: Defect Investigation and Pre-Litigation Procedure

Investigation begins with a visual walk of the property – identifying conditions consistent with a defect (cracking, water staining, deflection, finish failures). Where indicated, destructive testing follows – removing finishes to inspect the construction behind them and confirm causes. Experts are involved from day one: defect consultants, building-envelope specialists, and structural or geotechnical experts depending on the defect type. For residential cases under SB 800, the pre-litigation procedure runs in parallel – notice of claim under Cal. Civ. Code §§ 895-945.5, the builder’s statutory right to inspect, and the builder’s offer to repair. For HOAs, the Calderon process under § 6000. For commercial cases, investigation typically runs alongside a contractual notice obligation.

Step 2: Notice, Filing, and the Chain of Parties

Once pre-litigation procedures are complete (or have failed to resolve), the complaint follows. Construction defect cases are rarely two-party. The owner sues the developer and the general contractor; the developer cross-complains against the subs whose scope is implicated and against the architects and engineers; the subs cross-complain laterally where multiple trades intersect. Court selection and venue, the initial procedural posture, and any arbitration-clause questions all get worked through here. The chain of parties expands quickly, and managing it is a central part of how the case proceeds.

Step 3: Discovery and Expert Work

Discovery in defect cases runs expert-heavy. Defect experts produce reports identifying conditions, assigning responsibility among the parties, and supporting the cost-of-repair analysis. Cost-of-repair experts develop remediation scopes and pricing. Scheduling experts come in where delay damages are in play. Depositions of project participants – superintendents, project managers, design professionals, subs – fill out the factual record. Document discovery runs across the project file: pay applications, RFIs, submittals, change orders, daily logs, and quality-control records. Daubert and Sargon challenges to expert methodology are common in the larger matters.

Step 4: Mediation, Trial, or Arbitration

Most construction defect cases resolve at mediation. The mediation is often multi-day and multi-party, built around the defect-expert reports and the cost-of-repair models, and frequently structured around how the liability and the funding allocate across multiple defendants and insurers. Where settlement fails, the case proceeds to trial – or to arbitration when a binding clause applies. Allocation among the responsible parties and the participating insurers is the typical sticking point and often the central settlement question.

Why Choose Daily Aljian for Your Construction Defect Litigation Matter

Construction defect cases reward focus. Daily Aljian’s practice is built for them.

We focus on construction defect litigation.

Not a generalist construction practice. The firm works the pursuing side of defect cases – owners, HOAs and condo associations, and the developers and GCs whose own claims run down the contracting chain.

We work the chain – owner, developer, GC, subs, design professionals.

Chain-of-contract fluency matters in defect cases. The firm builds each case understanding how the contracting chain runs, where each party’s responsibility starts and ends, and how indemnity and insurance flow across the parties.

We coordinate with the experts the case needs.

Defect consultants, cost-of-repair experts, scheduling experts, structural and geotechnical engineers, and building-envelope specialists. The firm has worked with the experts who do this work full-time and brings them in at the investigation stage, not late.

We bill the way the work demands.

Most defect engagements are quoted on an hourly or hybrid basis, with fee structure discussed up front. Daily Aljian does not run defect work on volume-contingency. Pricing, expert costs, and scope are clear before the engagement begins.

We see you as a partner.

Our clients are partners in the work, not case numbers. The firm shares its reasoning, welcomes client input, and stays accessible from the first conversation through resolution.

We think past the dispute.

Defect cases carry collateral consequences – contractor license-board exposure, business-relationship effects, insurance underwriting impacts, and reputational issues. The firm helps clients see those alongside the litigation rather than after it.

Our California Construction Defect Service Area

Newport Beach is home base. Daily Aljian represents clients on construction defect matters across California – defect claims are governed by California law regardless of the county in which the project sits.

  • Orange County
  • Los Angeles County
  • San Diego County
  • Riverside County
  • San Bernardino County
  • Ventura County
  • Santa Barbara County
  • Kern County
  • San Francisco County
  • Alameda County
  • Santa Clara County
  • Sacramento County

The firm also accepts larger or multi-property matters elsewhere in California on a case-by-case basis.

FAQs About California Construction Defect Litigation

How long do I have to bring a construction defect claim in California?

California uses a statute-of-repose framework on top of the standard statutes of limitations. Cal. Code Civ. Proc. § 337.15 sets a 10-year outer limit for latent defects – defects that were not and could not reasonably have been discovered at completion. Cal. Code Civ. Proc. § 337.1 sets a 4-year limit for patent defects. Within those outer boundaries, the underlying statutes of limitations (typically the 4-year contract limit or the 3-year property-damage limit) run from discovery. SB 800 layers additional fitness-and-finish timing under Cal. Civ. Code §§ 896-897 on residential claims.

What is California’s Right-to-Repair Act (SB 800)?

The Right-to-Repair Act at Cal. Civ. Code §§ 895-945.5 governs defect claims on original construction of new residences sold after 2003. It defines actionable defect standards by building component (water, structural, soils, fire protection, plumbing, electrical, finishes) and requires a pre-litigation procedure before suit. The owner serves a notice of claim, the builder gets a defined right to inspect, and the builder may make an offer to repair. The procedure is designed to surface and resolve defects before litigation; it does not waive the right to sue if the process does not resolve the dispute.

My condo association has defects – what is the Calderon process?

Calderon, codified at Cal. Civ. Code § 6000 and following sections, is the pre-litigation procedure that applies when a common-interest development association – typically an HOA or condo association – brings a defect claim involving more than a small number of units. It requires notice to the builders and design professionals named in the claim, a mandatory meeting, and an opportunity to inspect the property and discuss resolution before suit is filed. For larger residential developments, Calderon and SB 800 procedures often run together.

How does a defect investigation work?

The investigation runs in two phases. Visual investigation identifies surface conditions consistent with a defect – water staining, cracking, deflection, finish failures. Destructive testing follows where indicated, opening walls, ceilings, or assemblies to inspect the construction behind the finishes. Defect experts run the investigation and produce the report on which the claim is built. The investigation phase is often the most important phase of a defect case because the findings drive everything that follows.

Do I have to arbitrate my construction defect dispute?

It depends on the contracts. Many commercial construction contracts and many residential purchase agreements contain arbitration clauses. Whether a clause is enforceable, whose claims it covers, and how it interacts with SB 800 or Calderon procedures are their own legal questions. Daily Aljian reviews the contracting documents at the start of every engagement and may raise enforceability or scope challenges where the law supports them.

What can a developer or GC recover from subs after a defect claim?

Recovery typically runs on indemnity and contribution theories. Express indemnity clauses in the subcontracts may shift defense and indemnity to the responsible sub. Equitable indemnity and contribution principles can supplement express indemnity where contracts are silent or partial. The recoverable amount turns on the contract language, the work each sub performed, and how cleanly the defect attaches to that sub’s scope. Pursuing the chain is often the central response to a defect claim landing on a developer or GC.

What does construction defect litigation cost?

Defect litigation is expert-driven, and the expert work is the largest single cost line. Engagements are typically billed hourly or on a hybrid basis, with the fee structure discussed up front. Fees, expert costs, and case strategy are addressed at the start so clients can make informed decisions about scope, posture, and resolution path.

Contact Our California Construction Defect Litigation Attorneys Today

Defects do not get cheaper to address while the claim deadline runs. Pursuing the right parties on the right theory at the right time is what defect litigation comes down to, and the framework California uses – SB 800, Calderon, the patent and latent statutes of repose – rewards owners and developers who get counsel in early.

Call us at 949-861-2524 or fill out our online contact form to schedule an initial consultation. Daily Aljian represents owners, HOAs and condo associations, commercial property owners, and developers and GCs pursuing pass-through claims on construction defect matters across California.